Skip to content

N-1/N upgrade test

Last updated: 2026-11-17T17:53:36-03:00 (UTC-3)

During a rolling upgrade the previous release (N-1) and the new one (N) run against the same PostgreSQL database for a while. The N-1/N upgrade test proves what happens then, with the real binaries: it builds N-1 from a git ref and N from the current tree, and runs both against one database.

Terminal window
npm --prefix web ci && npm --prefix web run build # once: the binary embeds the console
scripts/upgrade-n1-n.sh --previous v1.4.0 # a release tag, or any accepted commit
Input Meaning Default
--previous <ref> or GATEWAY_UPGRADE_PREVIOUS_REF The N-1 git ref: a release tag or an accepted commit The newest released version in CHANGELOG.md (tag v<version>); the script stops and asks for a ref when there is none
GATEWAY_UPGRADE_DATABASE_URL A PostgreSQL server where the test may create and drop its own database An owned postgres:16.15-alpine container (pinned by digest) on a random local port, removed with its volumes at the end (needs Docker)
--keep Keep the temporary directory with both binaries off

The script exports the N-1 tree with git archive into a temporary directory and builds it there; it never checks anything out in your working tree. When the old tree has no console build, the current one is embedded: the test exercises the API, not the console. It then runs go test -run '^TestUpgradeN1N$' ./internal/deploytest/, which skips unless both binaries and the database are given.

  1. N-1 alone creates the schema, saves a model override through the console API and serves inference with usage recorded.
  2. N joins the same database while N-1 keeps serving, and applies its new migrations (the test fails if N applies none).
  3. N-1 keeps working during the rollout: inference, reads of its configuration, and a console write (accepted, or refused cleanly with a status, never a crash).
  4. N reads what N-1 wrote and writes itself. A write right after N-1’s answers 409 until N’s control refresh sees the newer configuration version, as for any two replicas.
  5. A restarted N-1 refuses the newer schema at boot: it exits with an error that says the database has a migration newer than it supports, instead of serving.
  6. Nothing is lost: one usage event per provider call from both binaries, the latest model override, and the audit rows of both writes.

The test owns its database (upgrade_<random>) and drops it at the end; the mock provider runs inside the test process. No provider is called.

  • Keep N-1 replicas running while N migrates: they keep serving with the schema they know.
  • Do not restart an N-1 replica after N migrated: it refuses to start. Roll back by restoring the database backup taken before the upgrade, or by running N again.
  • Per-release rollback steps (flags and fields an older binary refuses) are in RELEASED.md in the source tree; turn off the new flags and remove the new fields before rolling back.
  • The test covers the default PostgreSQL profile and the API, not optional engines, the console or the Helm chart.
  • An N-1 build needs the Go toolchain of that release and network access for its modules when they are not in the local module cache.

m7gtwcontact@m7gtw.com